Plan Submittals & Documents

Attention: All plan submittals and documents submitted via the email address below (SFD238801@freese.com) are distributed to necessary personnel. Please do not send a separate email to TriRiver Water staff because it generates duplicate submittals, which may cause delays.


In an effort to respond to all requests in a timely fashion, all submittals, without exception, must be emailed to SFD238801@freese.com.

All requests/submittals are logged in and processed in order of receipt. It is the responsibility of the engineer/developer to ensure a submittal is complete. However, if a submittal is found to be incomplete, the applicant will be advised to resubmit and the resubmittal will be reassigned in order of receipt.

A complete submittal shall include the following:

  1. Construction Drawing prepared in accordance with the CD Review Checklist
  2. Comment by comment response document
  3. Stormwater Impact Analysis
  4. Downstream Sewer Analysis
  5. All applicable state, federal, and local permit applications/approvals

Construction Drawings (CDs) shall not be submitted for review until TRC approval has been received.

Procedure for submittal:

  • Include the name of project in subject line.
  • Provide a completed copy of the corresponding checklist.
  • Provide a completed copy of the project information form.
  • Provide a detailed response letter for resubmittals addressing previous comments.
  • Provide all applicable studies, reports, analyses, etc.
  • Provide an electronic copy of the plans, either as an attachment or with a file link to download (Upload size for EACH item is a maximum of 9.5MB).